Testing & Inspection

Quality control procedure as per IS 7285 (Part 1),
IS 7285 (Part 2) & IS 15490 High Pressure cylinder.

Sr.NoStageInspectionFrequency
1Raw MaterialDiameter, Wall Thickness, Length, SurfaceRandom
2Bottom Forminga) Bottom internal visual inspection
b) Bottom center thickness
10%
3Neck forminga) Neck Diameter
b) Neck Length
10%
4HardeningTime temperature chart.Batch Record.
5QuenchingOil Temperature, Hardness (As quenched)Monitoring
1 cylinder / Batch
6TemperingTime temperature chart Hardness (As tempered)Batch Record 100%
7Mechanical Testinga) Tensile,
b) Yield,
c) Elongation,
d) Impact test
e) Bend test
1 cylinder / Batch
8Burst testBurst with out fragmentation as per design1 cylinder / Batch
9MachiningThread check by standard plug gauge100%
10Water capacityBy weighments100%
11Hydrostatic stretch testAt test pressure by jacket method as per IS 5844100%
12Air leakage TestAt working pressure100%
13Internal Shot blastingVisual inspection100%
14StampingVerification100%
15Ultrasonic flaw detectionFlaw detection on cylinder parallel wall100%
16PaintingDFT Check5%
17WeightAfter final painting100%